Inspections can be created for permits, properties, violations, etc. If any inspection results in a failed inspection, a re-inspection can be scheduled using the Copy to New Inspection feature.
From the failed inspection record, go to Gear > Copy to New Inspection.
This will open a New Inspection window with the same task as the failed inspection. The Request Date and Request Time will be pre-filled, and the Inspection Date will default to the day after the failed inspection. Make any needed changes to the inspection data and click Save.
Related Articles